EU network code · draft
NC DR. The EU network code on demand-side flexibility
A draft network code that will set the rules for energy customers, storage and aggregators to take part in electricity markets and in services for system operators.
What the NC DR is
Form
A Commission implementing regulation adopted under Article 59(1)(e) of Regulation 2019/943. Once adopted, it applies directly in all EU Member States.NC DR, recitals · Regulation 2019/943, Art. 59Authors
The draft was prepared by ENTSO-E and the EU DSO Entity, then amended by ACER and submitted to the Commission.report, section 2What it covers
National terms for service providers, baselining, qualification of providers, the flexibility information system (FIS), local flexibility markets, coordination between operators and data exchange.NC DR, Titles I–XPrinciple
The code harmonises markets far, but leaves Member States, regulators and operators a lot of room. The details are set in national terms, conditions and methodologies approved by the regulator.report, section 4Ten key areas
The report identifies ten areas of the code that matter most for Poland.
report, section 41
FIS: the flexibility information system
A common national register of service providers and controllable units.
NC DR, Arts. 24–282
Prequalification of providers
Checking whether a provider and its resources can deliver the service.
NC DR, Arts. 16–233
Baseline
How much energy a customer would have consumed without a call to reduce.
NC DR, Arts. 14–154
TSO–DSO coordination
Common rules for cooperation between the transmission and distribution system operators.
NC DR, Arts. 45–525
Local flexibility markets
Market-based procurement of services by system operators.
NC DR, Arts. 29–396
AMI and metering data
Access to data from meters and measurements.
report, section 47
Consent management
Customers' consent to the use of their data and resources.
report, section 48
Settlement of services
Rules for pricing and settling local services.
NC DR, Art. 359
Register of controllable units (CU)
A record of resources that can provide services.
report, section 410
Interoperability
Compatibility of systems and data exchange.
NC DR, Arts. 53–54
Who it concerns
PSE
The transmission system operator and energy market information operator; competes with DSOs for distributed resources and may become the FIS operator.report, section 2DSOs
The large operators (Enea Operator, Energa-Operator, PGE Dystrybucja, Tauron Dystrybucja) will procure local services; their level of preparation differs.report, section 2Small DSOs
Almost 200 smaller operators; they are to take part in the national process of setting terms, most are likely to ask for derogations.report, sections 2 and 6Aggregators and suppliers
The code opens markets to aggregation, but Poland lacks an aggregation model and rules on dedicated measurement devices (DMD).report, section 6Customers
Industry and SMEs are today the main source of demand response; prosumers are a potential that requires metering and aggregation.report, section 2President of URE
The regulator will approve national terms, conditions and methodologies.report, sections 2 and 6Minister of Energy
Represents Poland in the committee that votes on the code and is responsible for implementation.report, section 2Timetable of NC DR obligations
06.2027
NC DR enters into force
Assumed date of entry into force of the code.
06.2028
National terms and conditions (T&C)
The URE President develops and approves national T&C within 12 months after entry into force.
12.2029
T&C for the FIS
Proposal of national T&C for the FIS within 18 months after the procedure under Art. 4.
06.2031
Data exchange
Full interoperability of data exchange in the deployed FIS within 48 months.
06.2033
Full FIS services
FIS service functionality in place within 36 months after approval of the T&C for the FIS.
Dates assume NC DR enters into force on 1 June 2027. This is the report authors' assumption, rather optimistic. section 7
What the NC DR means for Poland
Consistency
The Minister of Energy's draft system regulation of 22 May 2026 is largely consistent with the NC DR.report, section 4Two reservations
Flexibility products are defined by operators in contracts, and aggregators have no real possibility of providing services.report, section 4Changes needed in law
Choosing an aggregation model, rules on DMD, a mandate for the President of URE to approve common terms of all operators, standards for local markets set above the level of contracts.report, section 6Derogations
The report does not recommend asking for exemptions. It is better to defend the current shape of the code, which largely fits the Polish model, and use the time before entry into force to prepare CSIRE for DMD.report, section 6Recommended market model
Hybrid: different products at different DSOs, but common minimum standards.report, section 5Legal basis and documents
1
ACER framework guideline
At the Commission's request ACER prepares a non-binding framework guideline with principles for drafting the code and consults on it for at least two months. For the NC DR: submitted to the Commission on 20.12.2022.Art. 59(4)–(6)2
Proposal for the code
The EU DSO Entity in cooperation with ENTSO-E, supported by a drafting committee, submits a proposal to ACER within no more than 12 months. For the NC DR: 8.05.2024.Art. 59(9)–(10)3
Review by ACER
ACER checks consistency with the framework guideline, consults on the draft and submits it to the Commission within six months. For the NC DR: Recommendation 01/2025 of 7.03.2025.Art. 59(11)4
Adoption by the Commission
The Commission adopts the code as an implementing act under the examination procedure, with the approval of Member States in the committee. For the NC DR: pending (as of 14.10.2026).Art. 59(1), Art. 67(2)
Legal acts and the draft text
- EUR-Lex ↗Regulation (EU) 2019/943 on the internal market for electricityLegal basis of the NC DR: Article 59(1)(e) empowers the Commission to adopt the code, and Article 59 sets out the procedure for drafting it.
- EUR-Lex ↗Directive (EU) 2019/944 on common rules for the internal market for electricityProvisions the NC DR is to implement: Art. 17 (demand response through aggregation), Arts. 31 and 40 (tasks of distribution and transmission system operators), Art. 32 (incentives for the use of flexibility in distribution networks), Arts. 36 and 54 (ownership of energy storage by system operators).
- ACER ↗ACER Recommendation 01/2025 with the draft NC DRThe text of the draft code submitted to the Commission on 7.03.2025. This page and the report are based on it.
History and status
20.12.2022
ACER submits the framework guideline on demand response to the Commission. This is the starting point for drafting the code.
ACER ↗8.05.2024
ENTSO-E and the EU DSO Entity submit the draft code to ACER.
ENTSO-E ↗autumn 2024
ACER runs a public consultation on the draft (PC_2024_E_07).
ACER ↗7.03.2025
ACER submits the amended draft to the Commission as Recommendation 01/2025. This page and the report are based on this text.
ACER ↗14.07–12.09.2025
The Commission consults on ACER's draft (targeted consultation).
European Commission ↗26.03.2026
Meeting of the Electricity Cross-Border Committee; the Commission announces it will return to the work in summer 2026; no Polish representatives.
report, section 614.04.2026
Deadline for Member States' comments.
report, section 628.06.2026
No information on a vote on the NC DR in the Commission's calendar.
report, section 614.10.2026
Code not adopted: the Commission's page describes the NC DR as under development, no regulation in EUR-Lex.
European Commission ↗
Questions
Is the NC DR already in force?+
When will the NC DR enter into force?+
What does the NC DR change for DSOs?+
Can Poland still influence the code?+
More on the NC DR
Ask the assistant about the NC DR
The assistant knows the report, the text of the draft NC DR and 328 source documents. Every answer comes with its source.
Ask AI →The full report
Compliance analysis, changes in law and the full table of NC DR obligations (sections 4, 6 and 7).